NYCDDC – RED 367
Water Main Installation for New Building Construction and for Improvement to the City’s Water Main Distribution System and Fire Protection in Various Locations, Boroughs Of Brooklyn and Staten Island
JED Engineering was retained as a sub consultant to provide resident engineering inspection in connection with the installation water mains. Duties involved the construction inspection of both new water mains installation and replacement and upgrade of existing water mains, ancillary infrastructures and pavement restoration.
Construction Cost: $3.0 million
Status: Completed 2011